Advanced Energy AE 75TX Installation And Operation Manual page 85

Table of Contents

Advertisement

Advanced Energy®
AE
?STX and
AE
1 OOTX Inverters
it
DANGER:
Risque d'electrocution.
L'interieur de l'onduleur est
soumis
a
des hautes
tensions.
Les
interrupteurs de
courant alternatif
et
continu
doivent etre mis
HORS
TENSION durant les
travaux
sur
l'unite.
Attendez cinq
minutes
afin
de
permettre la
decharge
du
courant haute
tension avant
de
demonter les
panneaux avant de l'onduleur.
1.
Disconnect
the power to the inverter before
sta1ting
the
installation.
2
.
Remove the data monitodng
gland
plate
on
the light side
of
the
inve1
ter.
The data monitoring gland plate is a flat piece
of
metal
covering the
side
entry
po1t to the inve1ter's data monitoring compaitment.
3.
Cut a hole in the
desired
location to
allow
access
for
the
cable.
4
.
Install
a
water-tight conduit hub connection.
5.
Replace the
gland
plate.
6.
Route an Ethernet cable from a network
po1
t
,
that has been
approved
by the
network
adminisu·ator,
through the conduit hub on the inve1ter.
7
.
Connect
the Ethernet cable to the Ethernet po1t on the communications
inte1face
PCB.
The
communications
interface PCB
is
located in the
data
monito1ing
section
in
the right
upper
compa1tment of
the
inve1
ter.
Termination jumpers
(shown in "disabled"
position)
Address switch
Modbus slave port terminal blocks
Figure 6-4.
Communications interface PCB in the data monitoring section
570-1001793-0SB
Data Monitoring and Controls
6-7