De-energize/Isolation Procedures
The
following procedure should be
followed to de-energize the
inve1ter
for
maintenance.
TO DE-ENERGIZE THE INVERTER
it,
DANGER:
Risk of electrical
shock.
When exposed to
light, PV
arrays create electrical
energy
that could cause a hazardous condition.
fil
DANGER:
Risque
d'electrocution.
L'autorisation officielle de votre compagnie locale
d'electricite
est requise avant de brancher l'onduleur sur le reseau
public.
Seul le personnel qualifie est autorise a brancher le dispositif sur le reseau
public d'electricite.
fil
DANGER:
This unit contains
energy
storage devices that take up to 5 minutes to
discharge. Verify the high
energy
capacitors are
completely
discharged
before working on this unit.
fil
DANGER:
Cette unite contient des dispositifs de stockage d'energie qui prennent
jusqu'a 5 minutes pour se
decharger.
Verifier que les condensateurs a haute
energie sont completement decharges avant de travailler sur l'unite.
1.
Tum the
inve1ter'
s
ON/OFF switch
to the OFF
position.
2
.
Disconnect the
PV a1rny
connection
to the
inve1ter
using the
external
PV
disconnect
3. Tum the DC disconnect to the
power OFF
position by rotating the DC power
lever
to the off
position.
The
display on
the
upper
front panel should be inactive.
4.
Wait
five
minutes.
5.
Tum the
AC
disconnect to the
power OFF
position by rotating the
AC
power
lever
to the off
position.
6.
Open
the utility
connection
circuit breaker or
the overcunent
protection
device,
a
breaker
or disconnect.
7
.
Install LOTO
devices
on
the equipment
as
necessaiy to comply
with
LOTO
requirements.