System Startup Procedure - Advanced Energy AE 75TX Installation And Operation Manual

Table of Contents

Advertisement

Advanced Energy®
AE
?STX and A
E
100TX Inverters
Operation
SYSTEM STARTUP PROCEDURE
fil
WARNING:
Before turning on the
inverter,
ensure that the front panels are closed
properly.
it
AVERTISSEMENT:
Assurez-vous de la bonne fermeture des
panneaux
anterieurs avant de
mettre l'onduleur en
route.
To Start the Inverter
1.
Tum the ON/OFF
switch
to the
OFF
position.
The
ON/OFF
switch
is located next to
the
display
screen.
Pause/scroll
button
ON/OFF
switch
Figure
5-1. Inverter display
2
.
Check
the
polaiity of
the DC positive and negative
connectors
to ensure
they
ai·e
wired
con
ectly.
3.
Conf
um
the PV
panel
open
circuit
voltage
is
at
or
below 600
VDC.
4
.
Close
all upper
and lower cabinet
doors.
5.
Tum
on
the
external AC connection to
the inve1ter.
6.
Tum the inve1ter's
AC disconnect
to the power ON position.
The display on
the
upper
front
panel should now
be
active.
7
.
Tum
on
the
external
DC disconnect to provide DC power to the
inve1
ter.
570-1001793-058
Operation
5-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ae 100tx

Table of Contents