Site Requirements - Huawei FusionModule800 Installation Manual

Smart small data center six fans
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Table 2-5 Recommended circuit breaker (NetCol500-A020)
Load
Recom
One
mende
Cooling
d Cable
Only
and
Smart
Circuit
Cooling
Breaker
Product
Specifi
cations
≤ 6
Circuit
C80/3P
kW
breaker
specifica
tions
Input
5 x 16
power
mm
cable
specifica
tions
12
Circuit
-
kW
breaker
specifica
tions
Input
-
power
cable
specifica
tions

2.3 Site Requirements

Figure 2-1
Issue 10 (2019-12-20)
One
Smart
Cooling
Product
with
Heating
and
Humidif
ication
C80/3P
5 x 16
2
2
mm
-
-
The customer needs to purchase power cables based on site requirements.
shows the space requirements for the equipment room.
The cabinet layouts shown in the figures are for ease of description and do not provide reference for
engineering layout.
If the site conditions do not meet the space requirements, contact Huawei technical support.
Copyright © Huawei Technologies Co., Ltd.
Two
One
Cooling
Cooling
Only
Only
Smart
Smart
Cooling
Cooling
Products
Product
+ One
Smart
Cooling
Product
with
Heating
and
Humidif
ication
C100/3P
C100/3P
5 x 16
5 x 16
2
2
mm
mm
C80/3P
C100/3P
5 x 25
5 x 25
2
2
mm
mm
2 Installation Preparations
Two
Three
Smart
Smart
Cooling
Cooling
Products
Products
with
Heating
and
Humidif
ication
C125/3P
-
5 x 16
-
2
mm
C100/3P
C100/3P
5 x 25
5 x 25
2
2
mm
mm
Term
Resid
inal
ual
Speci
Curre
ficati
nt
ons
Circu
it
Brea
ker
-
100
mA
M6
-
OT
termin
al
-
300
mA
M6
-
OT
termin
al
20

Advertisement

Table of Contents
loading

Table of Contents