Power Cable Routing; Smart Module Grounding - Huawei FusionModule800 Installation Manual

Smart small data center six fans
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)

4.3 Power Cable Routing

Figure 4-15 Power cable routing
(1) Power cable from the battery to
the UPS

4.4 Smart Module Grounding

1.
2.
3.
Issue 10 (2019-12-20)
The customer can purchase power cables as required. The recommended specifications of mains input
power cables are as follows:
6 kW and 7.5 kW loads (BOM number: 25030857): 600 V/1000 V-ZA-YJV-5 x 16 mm
cores: yellow, green, red, blue, black)-107 A-CE
12 kW and 15 kW loads (BOM number: 25030858): 600 V/1000 V-ZA-YJV-5 x 25 mm
cores: yellow, green, red, blue, black)-138 A-CE
Deploy a general ground bar (shown by (1) in
Connect the general ground point (shown by (1) in
general ground bar in the Converged Cabinet.
Connect the general ground bar in the Converged Cabinet to the floor ground bar or
collective ground bar.
Copyright © Huawei Technologies Co., Ltd.
(2) Mains input power
cable
Figure
4-16) in the Converged Cabinet.
Figure
4-17) in each cabinet to the
4 Cable Routing
(3) PDU2000 power
cable
2
-Black (5
2
-Black (5
204

Advertisement

Table of Contents
loading

Table of Contents