Huawei FusionModule800 Installation Manual page 88

Smart small data center six fans
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Bottom Pipe Routing
Issue 10 (2019-12-20)
Figure 3-57 Top pipe routing inside the IT cabinet
Laying out pipes inside the Converged Cabinet
Figure 3-58
shows the pipe layout.
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation
79

Advertisement

Table of Contents
loading

Table of Contents