Cable List - Huawei FusionModule800 Installation Manual

Smart small data center six fans
Hide thumbs Also See for FusionModule800:
Table of Contents

Advertisement

FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Figure A-5 Preparing monitoring cables (RJ12)
A.3 Cable list
Table A-2 Cable list
BOM Number
04092766
04092767
04092768
04070794
04070008
04150547
04150671
04151746
04151745
04151745-001
04151748
04151748-001
Issue 10 (2019-12-20)
Cable Position
Emergency fan power cable
Cable from the smart cooling product to the T/H sensor
Power cable from the ECC800 to the smart ETH gateway
Signal cable from the ECC800 to the smart ETH gateway
Cable from the smart ETH gateway to the iBOX
Cable from the door status sensor to the AI/DI module
Cable from the AI/DI module to the ECC800
T/H sensor cascading cable
Cable from the camera to the smart ETH gateway
Cable between battery packs
Cable from the battery pack to the 10 kVA UPS
Cable from the battery pack to the 20 kVA UPS (required for N or
2N configuration)
Cable from the battery cabinet to the 10 kVA UPS
Cable from the battery cabinet to the 10 kVA UPS deployed outside
the aisle containment
Cable from the battery cabinet to the 20 kVA UPS
Cable from the battery cabinet to the 20 kVA UPS deployed outside
Copyright © Huawei Technologies Co., Ltd.