FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Issue 10 (2019-12-20)
Figure 3-54 Top pipe routing inside the Converged Cabinet
(Optional for installing a third smart cooling product) Laying out pipes inside the IT
cabinet
a.
Remove the six cable rings from the side-routed pipe in the rear of the IT cabinet, as
shown in
Figure
3-55.