Figure 3-36 Installing guide rails
Step 3 Engage floating nuts into appropriate positions on the cabinet column using a floating nut
mounting bar or a flat-head screwdriver, as shown in
each side, as shown in
Figure 3-37 Floating nut installation positions
Issue 10 (2019-12-20)
Figure
3-38.
Copyright © Huawei Technologies Co., Ltd.
3 Hardware Installation
Figure
3-37. Install two floating nuts on