Table 6-19 Setting teamwork control parameters for two smart cooling products
Parameter
Teamwork function
Teamwork group no.
Teamwork unit address
Total number of units
Number of running units
Rotation
Rotation period
Rotation time
Requirement control
Table 6-20 Setting teamwork control parameters for three smart cooling products
Parameter
Teamwork function
Teamwork group no.
Teamwork unit
address
Total number of units
Number of running
units
Rotation
Rotation period
Rotation time
Requirement control
Issue 10 (2019-12-20)
Smart Cooling Product No.
1
Enable
1
1
2
1 (1 standby smart cooling product)
Enable
The parameter can be set by the day ranging
from one day to 30 days as required.
The parameter can be set by the hour
ranging from midnight to 23:00 as required.
Competitive running avoidance
Smart Cooling Product No.
1
Enable
1
1
3
2 (1 standby smart cooling product)
Enable
The parameter can be set by the day
ranging from one day to 30 days as
required.
The parameter can be set by the
hour ranging from midnight to
23:00 as required.
Competitive running avoidance
Copyright © Huawei Technologies Co., Ltd.
6 Power-On Commissioning
2
Enable
1
2
N/A
N/A
N/A
N/A
N/A
N/A
2
3
Enable
Enable
1
1
2
3
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
268