FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Table 5-3 Pipe connection checklist
Check That
Pipe connectors are correct. The refrigerant
pipe tilts and has supports.
The hose clamps and cable ties of the
drainpipe are secured.
The refrigerant pipe and water pipe are
wrapped with thermal insulation foam.
All pipes have been checked for leaks.
Water pipe joints have been sealed by
sealant.
The pipes are not bent by a large angle.
Stop valves for the gas pipe and liquid pipe
of the outdoor unit are open.
Cable holes in walls are sealed.
Cabinet Installation Check
Table 5-4 Cabinet installation check items
No.
1
2
3
4
5
6
7
8
9
Issue 10 (2019-12-20)
Check That
The cabinet layout position is consistent with the
equipment room layout diagram.
All bolts are tightened, especially the bolts used for
electric connection. Flat washers and spring washers are
installed properly.
The cabinet is clean and free of dust and other materials.
The cabinet is clear and complies with dustproof
requirements.
The paint on the cabinet exterior is intact. Promptly
repaint the cabinet exterior if necessary to prevent
corrosion.
The cabinet door and lock work properly.
All labels are correct, clear, and complete.
The cabinet has no waste tape, cable ties, paper, or
packing materials around it.
All components are properly installed and no component
Copyright © Huawei Technologies Co., Ltd.
5 Checking After Installation
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
Check Result
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed
□ Passed □ Failed