6.
Step 4 Create a user.
When connecting to the VCN on the NetEco, you need to log in to the VCN as a non-admin
user.
1.
2.
3.
4.
----End

6.4 Power-On Commissioning for the Cooling System

6.4.1 Equipment Power-On

Prerequisites
Issue 10 (2019-12-20)
Click Next to complete the recording plan setting. When
the recording plan has been set successfully.
Click Finish.
Log in to the VCN IVS as user Admin.
On the VCN IVS home page, double-click Add User, create a user, and click Next. The
Assign Rights page is displayed.
When creating a user, you can select Enable account validity period and set Valid from and Valid to
to set the account validity period for the created user.
Figure 6-22 Creating a user
Set Multi-point logins to a value greater than 2.
In the Assign Device View Rights area, select the cameras to be browsed and queried by
the user. Set other parameters based on the documentation delivered with the equipment
or the documentation obtained by referring to the Preparing Documentation section,
and click Finish.
Verify that the humidifier water inlet pipe and drainpipe are correctly connected, that the
thermal insulation foam is intact, and that refrigerant has been charged.