FusionModule800 Smart Small Data Center
Installation Guide (Six Fans)
Figure 3-109 Installing a SIM card
Step 3 Reconnect the signal cable to the panel of the ECC800 main control module based on the
recorded position.
Step 4 Install the antenna.
1.
2.
3.
4.
----End

3.11.2 Installing a PAD

Prerequisites
Cabinets have been combined.
Issue 10 (2019-12-20)
Attach the antenna to the middle of the cabinet top.
Route the antenna cable into the cabinet through the signal cable hole at the top of the
cabinet and then to the appropriate port on the ECC800.
Connect the 2.4G antenna cable to the RF_Z port on the ECC800.
Connect the 3G antenna cable to the 3G/4G port on the ECC800.
Figure 3-110 Installing an antenna cable
Copyright © Huawei Technologies Co., Ltd.