Site Preparation
3.1
Overview
The following sections help you to prepare for system installation. Included is information
for unpacking and inspecting the system, requirements, technical data, and other
information you need to know prior to installation.This section also gives checklists for site
preparation.
3.2
Site Planning Considerations
Make sure to read all warning and cautions before you install the AXP1440-C07.
3.2.1
Receiving and Unpacking the System
Carefully inspect the shelf and all components delivered together with it.
Personal Injury
The system is heavy. To prevent injury, keep your back straight and have two people
lift the system or use additional lifting equipment
System Damage
Unstable system installation in a rack can cause the rack to tip over.
If your system is the only one in the rack, make sure to mount the system in the
lowest part of the rack. If other systems are installed in one rack, start with the
heaviest component at the bottom.
If the rack is equipped with stabilizing devices, make sure that they are installed and
extended so that the rack is secure. Then proceed to mount or service the system.
Do not tilt the system forward or backward when removing it from the system
package as the FRU ejector handles at the bottom could be damaged.
Damage of Circuits
Electrostatic discharge and incorrect RTM installation and removal can damage
circuits or shorten their life.
Before touching the RTM or electronic components, make sure that you are working
in an ESD-safe environment.
AXP1440-C07 Installation and Use (6806800V18A)