VLT AQUA High Power Instruction Manual
3.2.3 Transportation and Unpacking
Before unpacking the adjustable frequency drive, it is recommended to unload it as close as possible to the final installation site.
Remove the box and handle the adjustable frequency drive on the pallet, as long as possible.
NOTE!
The card box cover contains a drilling master for the mounting holes in the D frames. For the E size, please refer to section
Dimensions
later in this chapter.
Figure 3.2: Mounting Template
®
MG.20.P3.22 - VLT
is a registered Danfoss trademark
3 How to Install
Mechanical
3
3-3
Need help?
Do you have a question about the VLT AQUA and is the answer not in the manual?
Questions and answers