How to Install
Design Guide
5.2.3 Transportation and Unpacking
Before unpacking the frequency converter, position it as
close as possible to the final installation site. Remove the
box and leave the frequency converter on the pallet as
long as possible.
5.2.4 Lifting
Lift the frequency converter using the dedicated lifting
eyes. For all E2 (IP00) enclosures, use a bar to avoid
5
5
bending the lifting holes of the frequency converter.
The following illustrations demonstrate the recommended
lifting methods for the different frame sizes. In addition to
Illustration 5.8, Illustration 5.9, and Illustration 5.10, a
spreader bar is an acceptable way to lift the F-frame.
WARNING
The lifting bar must be able to handle the weight of the
frequency converter. See Table 5.2 for the weight of each
frame size. Maximum diameter for the bar is 2.5 cm (1
inch). The angle from the top of the drive to the lifting
cable should be 60° or greater.
Illustration 5.6 Recommended Lifting Method, D-frame Size
MG20Z202
Danfoss A/S © Rev. 06/2014 All rights reserved.
79