4 Repair
4.3.3 Replacing the position indicator (Optional)
4.3.3 Replacing the position indicator (Optional)
General
See foldouts 3 and 4 in chapter, Foldout.
Removing
1
2
3
4
5
Refitting
1
2
3
4
5
96
Action
Remove the flange plate.
Loosen the connector R1.LS.
Removing the two limit switches.
Loosen the cables from the switches.
Remove the cabling through the base.
Action
Route the new cabling through the base.
Connect the cables to the switches.
Assemble the two limit switches.
Connect connector R1.LS.
Assemble the flange plate.
© Copyright 2006-2018 ABB. All rights reserved.
Note
See foldout/pos. <4/138>
See foldout/pos. <3/174>
Note
See foldout/pos. <3/174>
See foldout/pos. <4/138>
Product manual - IRB 1410
3HAC026320-001 Revision: N