Installation And Commissioning; Introduction - ABB IRB 1410 Product Manual

Hide thumbs Also See for IRB 1410:
Table of Contents

Advertisement

2 Installation and commissioning

2.1 Introduction

General
This chapter contains assembly instructions and information for installing the IRB
1410 at the working site.
More detailed technical data can be found in the Product specification for the IRB
1410, such as:
Safety information
Before any installation work is commenced, it is extremely important that all safety
information is observed.
There are general safety aspects that must be read through, as well as more specific
safety information that describes the danger and safety risks when performing the
procedures. Read the chapter
work.
Product manual - IRB 1410
3HAC026320-001 Revision: N
Load diagram
Permitted extra loads (equipment), if any
Location of extra loads (equipment), if any.
Note
If the IRB 1410 is connected to power, always make sure that the robot is
connected to protective earth before starting any installation work.
For more information see:
Product manual - IRC5
© Copyright 2006-2018 ABB. All rights reserved.
2 Installation and commissioning
Safety on page 17
before performing any installation
2.1 Introduction
47

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents