Suzuki Ignis Service Manual page 1760

Rg413
Table of Contents

Advertisement

C-06, Fuel Pump Relay Circuit
Test Table (For RM413D)
Test
Work Order Description
T01
Check: Interruption of Signal Circuit
• Remove electrical component from socket:
Fuel Pump Relay
• Ignition ON
• Measure voltage between the following terminals:
Fuel Pump Relay – Socket terminal C53-2
&
Ground
Yes: T02
T02
Check: Interruption of Voltage Supply Circuit
• Measure voltage between the following terminals:
Fuel Pump Relay – Socket terminal C53-3
&
Ground
Yes: T03
T03
Check: Short to Voltage/Ground/Interruption of Signal Circuit
• Ignition OFF
Disconnect wiring harness connector from:
ECM (Wiring Harness Connector E27)
• Ignition ON
• Measure voltage between the following terminals:
ECM – Wiring harness connector (wiring harness side) terminal E27-75
&
Ground
Yes: T04
T04
Check: Short to Ground/Interruption of Signal Circuit
• Ignition OFF
• Measure resistance between the following terminals:
ECM – Wiring harness connector (wiring harness side) terminal E27-75
&
Ground
Yes: T05
T05
Check: Interruption of Signal Circuit
• Measure resistance between the following terminals:
ECM – Wiring harness connector (wiring harness side) terminal E27-75
&
Fuel Pump Relay – Socket C53-1
Yes: T06
T06
Check: Short to Voltage of Ground Circuit
• Ignition ON
• Measure voltage between the following terminals:
Fuel Pump Relay – Socket terminal C53-4
&
Ground
Yes: T07
ENGINE GENERAL INFORMATION AND DIAGNOSIS (Z13DT ENGINE) 6-3-101
Nominal Value
greater than 11 V
No: E11
greater than 11 V
No: E10
less than 0.3 V
No: E09
greater than 500
kOhm
No: E08
less than 5 Ohm
No: E07
less than 0.3 V
No: E06

Advertisement

Table of Contents
loading

Table of Contents