Volkswagen Passat 1995 Official Factory Repair Manual page 4087

Hide thumbs Also See for Passat 1995:
Table of Contents

Advertisement

Heating and ventilation system
http://ebahn.bentleypublishers.com/vw/servlet/Display?action=Goto&type=repair&id=VW.B4.HA01.80.1
Page 15 of 21
Heating and ventilation
cables, installing and
adjusting
Notes:
Attach cables to removed
controls first and then
adjust on heater levers and
secure.
Ends of sleeves on cables,
which are marked with a
stripe of paint, must be
secured to the controls.
Position sleeves of cables -
1-, -2- and -4- at stops on
the controls and then
secure. Secure sleeve for
cable -3-
Fig. 5
With controls installed,
adjust cables at flap levers.
When turning control knobs
all flaps must be heard to
contact the stops.
80-15
.
12/7/2004

Advertisement

Table of Contents
loading

Table of Contents