Space planning should also include the possible addition of equipment or other changes in space
requirements. Depending on the current or future equipment installed at your site, layout plans
can also include provisions for:
Channels or fixtures used for routing data cables and power cables
Access to air conditioning ducts, filters, lighting, and electrical power hardware
Communications cables, patch panels, and switch equipment
Power conditioning equipment
Storage area or cabinets for supplies, media, and spare parts
Operational Space
43
Need help?
Do you have a question about the Integrity NonStop NS2100 and is the answer not in the manual?