AT&T 3B2 Off-Line Diagnostic Manual page 474

Hide thumbs Also See for 3B2:
Table of Contents

Advertisement

Phase Descriptions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Phase #19
~
EPORTS -
External
see
Interrupts
Phase Name:
Type:
Function:
Tests:
EPORTS -
External SCC Interrupts (int2)
Interactive
This phase checks the external looping cable from one port to another on the
EPORTS board.
SCCO
I
I
I
I
I
SCC1
:
________ .J
I
____________ .J
SCC2
I
I
I
I
I
I
I
I
SCC3
I
I
I
I
________ .J
I
I
____________ .J
All eight port channels are tested for the following interrupts in this phase:
parity error
framing error
CTS changed
DCD dropped
Tests 1 through 4 -
check transmission of interrupts from SCCO Channel A
(Port 0) to SCC1 Channel B (Port 3):
Test 1 -
parity error.
Test 2 -
framing error.
Test 3 -
CTS change.
Test 4 -
DCD dropped.
Tests 5 through 8 -
check transmission of interrupts from SCC1 Channel B
(Port 3) to SCCO Channel A (Port 0):
Test 5 -
parity error.
Test 6 -
framing error.
Test 7 -
CTS change.
Test 8 -
DCD dropped.
Tests 9 through 12 -
check transmission of interrupts from SCC1 Channel A
(Port 2) to SCCO Channel B (Port 1):
Test 9 -
parity error.
Test 10 -
framing error.
Test 11 -
CTS change.
Test 12 -
DCD dropped.
9-30
OFF-LINE DIAGNOSTIC MANUAL