Phase #12 Tests - AT&T 3B2 Off-Line Diagnostic Manual

Hide thumbs Also See for 3B2:
Table of Contents

Advertisement

Phase Descriptions - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Phase #12 ....;... Verify DOS/ZOMBIE Commands Test
Phase Name:
Type:
Function:
Tests:
Time:
Warnings:
Notes:
Phase #12 Tests
Send Determine Operational Status (DOS)/ZOMBIE Commands to ISC
(dotests)
Demand
This phase verifies ISC execution of the DOS and ZOMBIE commands.
Test 1 -
verifies operation of the DOS ISC commands.
Test 2 -
verifies operation of the ZOMBIE ISC commands.
2 seconds
None
None
Test Number:
1
Function:
This test verifies the proper execution of the DOS ISC commands.
Procedure:
The ISC executes the DOS firmware commands and returns the completion
code to 3B2 computer resident diagnostic software.
Hardware Tested:
The ISC ROM firmware is tested.
Data Returned:
The execution condition PASS or FAIL is returned.
Test Number:
2
Function:
This test verifies the proper execution of the ZOMBIE ISC commands.
Procedure:
The ISC firmware executes the ZOMBIE commands and returns the completion
code to the 3B2 computer resident diagnostic software.
Hardware Tested:
The ISC ROM firmware is tested.
Data Returned:
The execution condition PASS or FAIL is returned.
6-22
OFF-LINE DIAGNOSTIC MANUAL

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the 3B2 and is the answer not in the manual?

Subscribe to Our Youtube Channel

Table of Contents