Chapter 5: Wiring the AT-SBxPWRSYS1-80 DC Power Supply
134
Figure 85. Tightening the Handle Locking Screw
9. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
10. Connect the power wires to the circuit breaker.
11. If you have two AT-SBxPWRSYS1-80 Power Supplies for the switch,
repeat this procedure to install the second power supply.
12. Repeat the procedures in this chapter to wire the DC connectors on
the AT-SBxPWRSYS1-80 DC Power Supplies on other switches for
the stack.
13. Go to "Configuring the Master Switch" on page 150 or "Configuring
Member Switches" on page 156.