Figure 91: Connecting The Power Cord To An Ac Power Source - Allied Telesis AT-SBx908 Installation Manual

Table of Contents

Advertisement

Chapter 6: Configuring Switches for Stacking
146
Figure 91. Connecting the Power Cord to an AC Power Source
Note
The illustration shows the North American power cord. Your power
cord may be different.
Note
The power cords included with AT-SBxPWRSYS2 Power Supplies
for 100-125 VAC installations have 20 Amp, 125 V NEMA 5-20P
plugs. The plugs require NEMA 5-20R receptacles. Refer to Figure
22 on page 73.
4. If the switch has two power supplies, repeat this procedure to connect
a power cord to the second power supply.
5. Wait two minutes for the switch to initialize its management software.
Afterwards, go to "Configuring the Master Switch" on page 150 or
"Configuring Member Switches" on page 156.

Advertisement

Table of Contents
loading

Table of Contents