Unpacking The Chassis; Figure 23: At-Sbx908 Gen2 Switch Shipping Box - Allied Telesis AT-SBx908 Installation Manual

Table of Contents

Advertisement

Chapter 3: Beginning the Installation

Unpacking the Chassis

74
Figure 23 shows the contents of the shipping box.
A
Figure 23. AT-SBx908 Gen2 Switch Shipping Box
The items in the box are listed here:
A - Protective bag
B - AT-SBx908 Gen2 Switch
C - Accessory kit
To unpack the switch, perform the following procedure:
1. Lift the switch from the shipping box and place it on a level, secure
table. Refer to Figure 24 on page 75.
B
C

Advertisement

Table of Contents
loading

Table of Contents