Planning The Stack - Allied Telesis AT-SBx908 Installation Manual

Table of Contents

Advertisement

Planning the Stack

Here are factors to consider when planning a stack:
How many SBx908 GEN2 Chassis will be in the stack? The
maximum is four chassis.
How many trunk links will there be between switches? The
maximum numbers of permitted links vary by Ethernet line card
and are listed in Table 10 on page 49.
Which ports on the line cards will be the trunk links? Refer to
"Stack Trunk" on page 44.
Do all the switches have the same version of the AlliedWare Plus
management software, preferably v5.4.8-0.2 or later? Instructions
in Chapter 6, "Configuring Switches for Stacking" on page 139
explain how to verify this information.
Have you selected ID numbers, in the range of 1 to 4, for the
switches? Refer to "Switch ID Numbers" on page 59.
AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
61

Advertisement

Table of Contents
loading

Table of Contents