Allied Telesis AT-SBx908 Installation Manual page 163

Table of Contents

Advertisement

3. If you have not already configured the master switch, perform
"Configuring the Master Switch" on page 150.
4. After configuring all the switches, confirm that they are all powered off.
5. Do all the switches have the same version of the AlliedWare Plus
operating software? If you filled out Table 11 on page 62, refer there
for the version numbers. If they have different versions, update them
before continuing, Refer to the Software Reference for SwitchBlade
x908 GEN2 Series Switches for instructions.
6. Cable the stacking ports on the master and member switches. Refer to
Chapter 7, "Cabling AT-XEM2 Line Card Ports" on page 167.
7. Power on the stack. Refer to "Powering on the Stack" on page 164.
8. Verify the switch formed the stack. Refer to "Verifying the Stack" on
page 165.
9. Cable the networking ports on the switches. Refer to Chapter 7,
"Cabling AT-XEM2 Line Card Ports" on page 167.
AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
163

Advertisement

Table of Contents
loading

Table of Contents