Figure 62: Connecting The Power Cord To An Ac Power Source - Allied Telesis AT-SB*908 GEN2 Installation Manual

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

Figure 62. Connecting the Power Cord to an AC Power Source
Note
The illustration shows the North American power cord. Your power
cord may be different.
Note
The power cords included with AT-SBxPWRSYS2 Power Supplies
for 100-125 VAC installations have 20 Amp, 125 V NEMA 5-20P
plugs. The plugs require NEMA 5-20R receptacles. Refer to Figure
22 on page 69.
4. If the switch has two power supplies, repeat this procedure to connect
a power cord to the second power supply.
5. Do one of the following:
To monitor the switch as it initializes the management software, go
to "Monitoring the Initialization Processes" on page 137.
Wait three minutes for the switch to initialize its management
software. Afterwards, go to Chapter 6, "Configuring Switches for
Stacking" on page 141.
AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
109

Advertisement

Table of Contents
loading

Table of Contents