Figure 24: Lifting The Switch From The Shipping Box; Figure 25: Removing The Switch From The Protective Shipping Bag - Allied Telesis AT-SB*908 GEN2 Installation Manual

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

AT-SBx908 GEN2 Installation Guide for Virtual Chassis Stacking
Warning
The switch is heavy. Ask for assistance lifting the device out of the
shipping box. You might injure yourself or damage the device if you
lift it without assistance.
Figure 24. Lifting the Switch from the Shipping Box
2. Remove the switch from the protective shipping bag and place it on a
level, secure table. Refer to Figure 25.
Figure 25. Removing the Switch from the Protective Shipping Bag.
71

Advertisement

Table of Contents
loading

Table of Contents