Allied Telesis AT-SB*908 GEN2 Installation Manual page 7

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

Figures
Figure 1: Front Panel of the AT-SBx908 GEN2 Chassis ......................................................................................................20
Figure 2: Rear Panel of the AT-SBx908 GEN2 Chassis.......................................................................................................20
Figure 3: AT-SBx908 GEN2 Ethernet Line Cards ................................................................................................................21
Figure 4: Management Panel ...............................................................................................................................................27
Figure 5: Switch ID LED .......................................................................................................................................................30
Figure 6: AT-SBxPWRSYS2 and AT-SBxPWRSYS1-80 Power Supplies ...........................................................................32
Figure 7: AT-FAN08 Module.................................................................................................................................................34
Figure 8: PORT Parameter in the Command Line Interface.................................................................................................35
Figure 9: Example Trunks for Stacks of Two, Three, or Four Switches ...............................................................................42
Figure 10: Stack of Three Switches with a Linear Trunk ......................................................................................................43
Figure 11: Example of a Trunk with Multiple Links Between Switches.................................................................................44
Figure 12: Example of a Stack Trunk of Ports on Multiple Line Cards .................................................................................45
Figure 13: Invalid Trunk with Too Many Stacking Ports .......................................................................................................46
Figure 14: Stack with Three Chassis ....................................................................................................................................47
Figure 15: Invalid Trunk Because Switches Have Different Numbers of Trunk Links ..........................................................48
Figure 16: Invalid Trunk with Different Ethernet Line Card Models ......................................................................................49
Figure 19: Example of a Stack Trunk with AT-XEM2-1CQ Line Cards ................................................................................52
Figure 20: Invalid Trunk Because a Chassis is Connected to Three Other Chassis ............................................................53
Figure 21: Invalid Trunk Because of Intermediary Network Devices ....................................................................................54
Figure 22: NEMA 5-20P Plug and Receptacle .....................................................................................................................69
Figure 23: AT-SBx908 Gen2 Switch Shipping Box...............................................................................................................70
Figure 24: Lifting the Switch from the Shipping Box .............................................................................................................71
Figure 25: Removing the Switch from the Protective Shipping Bag. ....................................................................................71
Figure 26: Pre-installed Items on the Front and Side Panels ...............................................................................................72
Figure 27: Pre-installed Items on the Rear Panel.................................................................................................................73
Figure 28: Accessory Kit.......................................................................................................................................................74
Figure 29: Items in the Shipping Box for the AT-SBxPWRSYS2 AC Power Supply ............................................................75
Figure 30: Items in the Shipping Box for the AT-SBxPWRSYS1-80 DC Power Supply .......................................................76
Figure 31: Chassis Orientations in the Equipment Rack ......................................................................................................79
Figure 32: Chassis Orientations in the Equipment Rack (Continued) ..................................................................................80
Figure 33: Chassis Orientations in the Equipment Rack (Continued) ..................................................................................81
Figure 34: Example of Adjusting the Equipment Rack Brackets ..........................................................................................82
Figure 35: Securing the Chassis to the Equipment Rack .....................................................................................................83
Figure 36: Stripping the Grounding Wire ..............................................................................................................................84
Figure 37: Removing the Grounding Lug from the Chassis..................................................................................................85
Figure 38: Attaching the Grounding Wire to the Grounding Lug...........................................................................................85
Figure 39: Installing the Grounding Lug and Wire ................................................................................................................86
Figure 40: Removing the Blank Power Supply Panel from Power Supply Slot B .................................................................88
Figure 41: Lifting the Locking Handle on the AT-SBxPWRSYS2 Power Supply ..................................................................88
Figure 42: Sliding the AT-SBxPWRSYS2 AC Power Supply into the Chassis .....................................................................89
Figure 43: Lowering the Locking Handle on the AT-SBxPWRSYS2 AC Power Supply .......................................................89
Figure 44: On/Off Switch on the AT-SBxPWRSYS1-80 DC Power Supply..........................................................................92
Figure 46: Lifting the Locking Handle on the AT-SBxPWRSYS1-80 DC Power Supply.......................................................93
Figure 47: Inserting the AT-SBxPWRSYS1-80 DC Power Supply .......................................................................................93
Figure 48: Lowering the Locking Handle on the AT-SBxPWRSYS1-80 DC Power Supply..................................................94
Figure 49: Removing a Blank Line Card Cover ....................................................................................................................95
7

Advertisement

Table of Contents
loading

Table of Contents