Chapter 5: Powering On the Chassis
136
7. With a #2 Phillips-head screwdriver, tighten the handle locking screw
to secure the power supply to the chassis. See Figure 88 on page 132.
8. Before attaching the power wires from the power supply to the circuit
breaker in the wiring closet, check that the circuit breaker is off.
9. Connect the power wires to the circuit breaker.
10. If you have two AT-SBxPWRSYS1-80 DC Power Supplies for the
switch, repeat this procedure to install the second power supply.
11. Turn the DC circuit breaker(s) on.
12. Turn the On/Off switch(es) on the AT-SBxPWRSYS1-80 DC Power
Supply(ies) to the On position. See Figure 67 on page 113.
13. Do one of the following:
To monitor the switch as it initializes the management software, go
to "Monitoring the Initialization Processes" on page 137.
Wait three minutes for the switch to initialize its management
software. Afterwards, go to Chapter 6, "Configuring Switches for
Stacking" on page 141.