Chapter 6: Configuring Switches for Stacking
Step
16
Confirm that the switches
are powered off.
17
Cable the trunk ports.
18
Power on the stack.
19
Confirm that the stack is
operating correctly.
20
Cable the networking
ports.
144
Table 12. Switch Configuration Procedures (Continued)
Description
Procedure
-
Chapter 7, "Cabling the
AT-XEM2 Line Card
Ports" on page 157
Perform, "Powering On
the Switches
Sequentially" on
page 169 to assign the
switch ID numbers
yourself.
Or perform "Powering On
the Switches
Simultaneously" on
page 172 to have the
switches assign the
numbers automatically.
"Verifying the Stack" on
page 174
Chapter 7, "Cabling the
AT-XEM2 Line Card
Ports" on page 157
AlliedWare Plus
Command or Manual
-
-
-
SHOW STACK command
in the User Exec mode.
-