Chapter 8: Powering On And Verifying The Stack - Allied Telesis AT-SB*908 GEN2 Installation Manual

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

Chapter 8
Powering On and Verifying the Stack
This chapter contains the following procedures:
"Introduction" on page 168
"Powering On the Switches Sequentially" on page 169
"Powering On the Switches Simultaneously" on page 172
"Verifying the Stack" on page 174
167

Advertisement

Table of Contents
loading

Table of Contents