Figure 47: Lowering The Retaining Clip; Figure 48: Connecting The Power Cord To An Ac Power Source - Allied Telesis GS950 PS V2 Series Installation Manual

Gigabit ethernet poe+ switches
Hide thumbs Also See for GS950 PS V2 Series:
Table of Contents

Advertisement

Chapter 7: Powering On the Switch
Figure 47. Lowering the Retaining Clip
5. Connect the other end of the power cord to an appropriate power
source. Refer to Figure 48.
Warning
Power cord is used as a disconnection device. To de-energize
equipment, disconnect the power cord.  E3
Note
Pluggable Equipment. The socket outlet shall be installed near the
equipment and shall be easily accessible.  E5
Figure 48. Connecting the Power Cord to an AC Power Source
84

Advertisement

Table of Contents
loading

This manual is also suitable for:

Gs950/10ps v2Gs950/18ps v2Gs950/28ps v2Gs950/52ps v2

Table of Contents