Figure 73: Securing The Bare Grounding Wire To The Grounding Post - Allied Telesis AT-SB*908 GEN2 Installation Manual

Advanced layer 3 plus modular switch, alliedware plus v5.4.8-0, virtual chassis stacking, chassis, ethernet line card, fan module, ac/dc power supply
Table of Contents

Advertisement

Chapter 5: Powering On the Chassis
118
5. Secure the wire with the nut and washer removed in step 2, and an 8
mm wrench, as shown in Figure 73.
Allied Telesis recommends tightening the nut and washer to 26 inch-
lbs.
Figure 73. Securing the Bare Grounding Wire to the Grounding Post
6. After connecting the grounding wire, go to "Choosing a Method for
Attaching the Power Wires" on page 119.

Advertisement

Table of Contents
loading

Table of Contents