Time Estimations

 Operational Maintenance
 Annual Maintenance
Initial Information Gathering
Physical Checks
Torque Checks
Inspection
Cleaning **
Meggering
Control Power Checks
Contactor Adjustments **
Voltage Level Checks
Firing Check
System Test **
Medium Voltage Checks
Final Inspection
Phasing Check **
Autotuning**
Operation to Maximum Load
Additional Tasks
Investigation **
Informal Training/Refresher **
Spare Parts Analysis **
Vacuum Bottle Integrity Check **
Final Report
Note: ** indicates that the time may not be required depending on the
nature of the maintenance and the condition of the drive system. These
times are only estimations.
0.5 hours per filter
0.5 hours
2.0 hours
2.0 hours
2.5 hours **
1.5 hours
2.0 hours **
1.0 hours
0.5 hours
2.0 hours **
0.5 hours
1.5 hours **
2.0 hours **
Site Dependent
Depends on Nature of the Problem **
2.0 hours **
1.0 hours **
3.0 hours **
3.0 hours