Required Tools; Preparing The Server For Component Replacement; Related Information - Oracle X7-2 Service Manual

Hide thumbs Also See for X7-2:
Table of Contents

Advertisement

Required Tools

Power supply (PS), designated as a backup quorum member.
When a server FRU that contains the KIP is removed and a replacement component is installed,
the KIP of the replacement component is programmed by Oracle ILOM to contain the same
KIP as the other two components.
Note -
be completed when two of the three quorum members contain matching key identity properties.

Related Information

"Servicing Power Supplies (CRU)" on page 87
"Servicing the Disk Backplane (FRU)" on page 151
"Servicing the Motherboard (FRU)" on page 199

Required Tools

The server can be serviced with the following tools:
Antistatic wrist strap
Antistatic mat
No. 2 Phillips screwdriver
Torx (6 lobe) T10, T15, T25, and T30 screwdrivers
12.0 in-lbs/ft (inch-pounds/foot) torque driver
Related Information
"Preparing for Service" on page 49

Preparing the Server for Component Replacement

Before you can remove and install components that are inside the server, you must perform the
procedures in some or all of the following tasks:
52
Oracle Server X7-2 Service Manual • October 2017
Only one of the quorum members can be replaced at a time. Automated updates can only

Advertisement

Table of Contents
loading

Table of Contents