Trip Arrangement With One-Phase Version - ABB REB670 Applications Manual

Busbar protection 2.1 ansi, relion 670 series
Hide thumbs Also See for REB670:
Table of Contents

Advertisement

Section 6
Differential protection
6.1.3.13
126

Trip arrangement with one-phase version

When one-phase version of the IED is used it is typically required to have three IEDs (that
is, one per phase). Thus, when busbar protection in one IED operates the trip commands
will be given to all bays but internal circuit breaker failure function will be started in the
same phase only. In order to secure internal breaker failure picking-up in all three phases
it is advisable to do the following. Connect Zone A trip signal from one IED to the external
trip input of the Zone A in the other two IEDs. Thus all three IEDs will then issue trip in
Zone A and pick-up internally circuit breaker failure protection in all three phases.
Note that:
similar arrangements shall be done for Zone B
this have to be done between all three IEDs (that is, three times)
Such a scheme can be arranged in one of the following ways:
by wiring between three IEDs
by using GOOSE messages when IEC 61850-8-1 is used
by using LDCM communication module.
Note that in this case the external trip signal from other two IEDs shall be arranged via
pulse timer in configuration in order to avoid locking of the trip signal between three IED.
Such arrangement via GOOSE is given in figure 52: