Application And Setting Notes (External Synchronization) - Siemens 6MD85 Manual

Siprotec 5 high-voltage bay controller
Hide thumbs Also See for 6MD85:
Table of Contents

Advertisement

Notes for Optional Input Interconnections
You have the option of connecting the input signals
omit these interconnections, observe the following instructions:
Input
>Close cmd. released :
If you do not interconnect the input signal
command with synchronization requirement is confirmed directly (execution successful: OPR+), as soon as the
output signal
Start syn. process is set. In this case, the (_:109) Max.durat. sync.process
setting has no meaning. If you use a control model with feedback monitoring, consider that the feedback
monitoring will start immediately when the
Feedback monitoring time setting must therefore be set higher than the maximum synchronization
time of the external synchronization device plus the circuit-breaker closing time. If
is not routed, the output
Input
>In progress :
The interconnection of the input signal
device has received the
external synchronization device rejects a start command, the negative acknowledgment of the circuit-breaker
close command does not occur until the maximum synchronization time (parameter (_:109) Max.durat.
sync.process) has expired.
Input
>Op. mode 'dir.cls.cmd' :
In case of a failure of the external synchronization device, you can also close the circuit breaker directly
without considering the synchronization conditions. To do this, activate the input signal
'dir.cls.cmd' or the parameter (_:110) Direct close command. The close command is then issued
directly by the bay controller.

Application and Setting Notes (External Synchronization)

6.4.14.2
Parameter: Mode
Default setting (_:1) Mode = on
With the Mode parameter, you switch the external synchronization function on or off. If you set the Mode
parameter to off, a circuit-breaker close command with synchronization requirement is rejected.
Parameter: Max.durat. sync.process
Default setting (_:109) Max.durat. sync.process = 30 s
The Max.durat. sync.process parameter defines the maximum synchronization time. The time starts
when the External synchronization function block sends a close command to the external synchronization
device. The command must be executed within this time. If the close command is not executed within this
time, the External synchronization function block sends a command to cancel closing to the external
synchronization device.
Parameter: Direct close command
Default setting (_:110) Direct close command = no
In case of a failure of the external synchronization device the Direct close command parameter is used to
close the circuit breaker directly without considering the synchronization conditions. If the parameter is acti-
vated a close command with synchronization requirement will not be transmitted to the external synchroniza-
tion device, but directly carried out by the bay controller.
SIPROTEC 5, High-Voltage Bay Controller, Manual
C53000-G5040-C015-9, Edition 11.2017
>Close cmd. released , the execution of a circuit-breaker close
Start syn. process signal is tripped. The (_:4201:103)
Start/stop syn. proc. is not set.
>In progress is intended to check whether the synchronization
Start syn. process signal. If you do not interconnect this input signal and the
>Close cmd. released and >In progress . If you
Control Functions
6.4 Synchronization Function
>Close cmd. released
>Op. mode
417

Advertisement

Table of Contents
loading

This manual is also suitable for:

6md86

Table of Contents