Siemens 6MD85 Manual page 397

Siprotec 5 high-voltage bay controller
Hide thumbs Also See for 6MD85:
Table of Contents

Advertisement

[dw_dim_3ph_and_1ph-voltage-trans, 1, en_US]
Figure 6-85
[dw_dim_two_1ph-voltage-trans, 1, en_US]
Figure 6-86
If you have routed the voltage transformers to the measuring points, set the corresponding transformer data
in the System data.
In the FG Circuit breaker, under General, set the rated voltage that is used as a reference for percentage-
value scaling.
Siemens recommends routing the functional measured values into the fault record in addition to the logical
signals. Route at least the functional measured values
2311:302) dα into the fault record. This allows you to document the commissioning and subsequently the
quality of synchronization.
The asynchronous operating mode defines the automatic synchronization of generators. For this reason, the
parameters for this operating mode are described in the following sections.
You can find the basic parameters in the setting sheet for the Syn./Asy.bal. stage in the General block. The
default settings for the parameters are typical values. You can use the default settings if the transformer has a
secondary rated voltage of 100 V.
SIPROTEC 5, High-Voltage Bay Controller, Manual
C53000-G5040-C015-9, Edition 11.2017
Connection of a 3-Phase and a 1-Phase Voltage Transformer (Phase-to-Phase Voltage)
Connection of Two 1-Phase Voltage Transformers (Phase-to-Phase Voltage)
(_:2311:300) dV , (_:2311:301) df , and (_:
Control Functions
6.4 Synchronization Function
397

Advertisement

Table of Contents
loading

This manual is also suitable for:

6md86

Table of Contents