Verify Gcc Operation - ABB PGC2000 Operation And Service Manual

Process gas chromatograph
Table of Contents

Advertisement

g. On the Manual Temperature Control Mode screen (see Figure 2-11), verify that the actual
temperature for the FPD is at least 120 degrees.
Figure 2-11. MANUAL TEMPERATURE CONTROL MODE SCREEN
h. When the temperature is at least 120 degrees, press the F1 (Escape) soft key two times to
return to the Manual Control Mode screen.
i.
On the Manual Control Mode screen, press the F2 (Detector and Graphics) soft key.
j.
On the Chroma Board screen, verify the flame is off and the Ignitor is Off.
k. Press the F4 (Manual Ignitor On) soft key to light the cell flame. The ignitor coil remains
powered for the specified Timeout period. Once the flame lights the Flame Out LED will go
off. The cell flame burns as long as there is sufficient burner air and hydrogen fuel in the cell.
14. With Dual Detectors, perform steps 12 and 13 for each detector, as appropriate.
15. Again verify settings with the Data Package and adjust as needed. Check oven temperature on
the Temperature Control screen (see "Temperature Control Table" in Section 4).

Verify GCC Operation

Restore all tables from E2PROM as follows:
2000-OSM, F1
****
Manual Temperature Control Mode
Zone
Config
ISO-OVEN
ISO
PROG. OVEN
PROG/C
FPD
ISO
LSV
ISO
Valve #
:
[0]
Zone #
:
2
Set Point:
220.00
Ramp Rate:
30.0000
VALVES
: - - - - - - - -
Accept
Escape
Control
Point
F1
F2
Actual
SP
79.9
80.0
220.1
220.0
120.2
125.0
199.9
200.0
Time
: 0125
State : Pk Back
T-Rating
T2
290C
Zero
Span
All
All
Zones
Zones
F3
F4
****
Rate
0.0
0.0
0.0
0.0
Ver
2-19