Epc Control Assembly Components - ABB PGC2000 Operation And Service Manual

Process gas chromatograph
Table of Contents

Advertisement

Be sure that the EPC Control Assembly has cooled to ambient temperature
(approximately one hour) before proceeding.
The Zones are arranged in the EPC Control Assembly enclosure with Zone one on the left
and Zone 5 on the right (see Figure 8-21).
Proportional Valve,
Zone 1
Sensor PCB,
Control PCB
Figure 8-21. EPC CONTROL ASSEMBLY COMPONENTS
1. Perform the "Preparation" procedure.
2. Remove the two screws holding the EPC cover and remove the cover panel.
3. Remove the ten screws holding the EPC Control Assembly cover using ABB Tool
TL1009 and remove the cover. Be careful not to damage the flame-proof or explosion-
proof surfaces of the cover or the body of the Control Assembly.
4. Unplug the large ribbon cable from the Control PCB and fold it back to your left and out of
the way (see Figure 8-22).
AC Power Cable from
Backplane PCB J44
Sensor PCB Cable,
Zone 1
Sensor PCB Cable,
Zone 2
Sensor PCB Cable,
Zone 3
Large Ribbon Cable
from EPC
Multibus PCB
Sensor PCB Cable,
Zone 5
2000-OSM, F2
CAUTION
Screw and
Proportional Valve,
Washer
Heater
Zone 1
Figure 8-22. EPC CONTROL PCB CABLING
Sensor PCB,
Zone 5
Zone 5
Heater Cable
Valve Cable, Zone 1
Valve Cable, Zone 2
Valve Cable, Zone 3
Valve Cable, Zone 4
Valve Cable, Zone 5
Sensor PCB Cable,
Zone 4
8-45

Advertisement

Table of Contents
loading

Table of Contents