3. On the Serial Configuration screen (see Figure 5-7), verify that the setup data is the same as that
specified in the Data Package.
4. If you want to make changes, use the cursor arrow keys to select the desired data line and enter
your changes.
5. When you have completed your changes, verify the data on the screen. To test these changes
press the F3 (Test Printer) soft key. If the results are not satisfactory, make additional changes
and test again.
6. When the results are complete and verified, press the F2 (Exit and Update) soft key to save the
changes, or press the F1 (Escape) soft key to retain the original values.
7. Press the F1 key as necessary to return to the Background screen.

SOFTWARE VERIFICATION

This section describes software checks that are not part of normal operation, but which may be used
to troubleshoot the analyzer. The primary task is to verify the digital configuration by performing the
following steps.

Preliminary Steps

1. If you have not already done so, verify all reports as described in "Verify Reports" in Section 2.
2. After all reports have been verified, press the F1 soft key as necessary until the Background
screen appears.
3. On the Background screen press the F1 (Exit To Commands) soft key.
5-8
***
Serial Configuration
Printer Setup
Baud Rate: 300 1200 2400 4800 9600
Parity:
None Even Odd
Data Bits:
7
8
Stop Bits:
1
2
Exit
Escape
and
Update
F1
F2
Figure 5-7. SERIAL CONFIGURATION SCREEN
Test
Printer
F3
F4
***