Quantum DXi4700 User Manual page 267

Hide thumbs Also See for DXi4700:
Table of Contents

Advertisement

Chapter 9: Configuration
Scheduler
Note: The thickness of the bars on the schedule view varies based on the type of event and the
selected time frame. Healthcheck events have an estimated span of 6 hours. Space Reclamation
events have an estimated span of 16 hours. All other open-ended events have a default span of 2
hours.
Figure 166: Scheduler Toolbar
Adding or Editing a Scheduled Event
To add or edit a scheduled event:
1. On the Scheduler page, adjust the schedule view to display the time period when the event will occur
(see
Viewing Scheduled Events on the previous
Figure 167 on the next
Add a New Event
To add a new event, click and drag on the schedule in the row for the type of event to add. A new
l
event is added where you dragged the cursor.
To schedule replication for NAS shares or VTL partitions, click the arrow next to the folder to
l
display all shares or partitions. Then click and drag in the row for the share or partition to
schedule.
The new event must begin after the current time, which is indicated by the dotted vertical line.
l
Edit an Existing Event
To edit an existing event, double-click the event. If the event is recurring, select Open this
l
occurrence to edit only the one instance of the event, or select Open the series to edit the
entire recurring series, and then click OK.
You cannot edit an event that occurred in the past.
l
You can also right-click an existing event to see options for editing an event.
l