AGC
Using flowcharts, the principles of the most important functions will be illustrated in the next
sections. The functions included are:
•
Mode shift
•
MB open sequence
•
GB open sequence
•
Stop sequence
•
Start sequence
•
MB close sequence
•
GB close sequence
•
Fixed power
•
Load take over
•
Island operation
•
Peak shaving
•
Mains power export
•
Automatic Mains Failure
•
Test sequence
The flowcharts below are for guidance only. For illustrative purposes the
flowcharts are simplified in some extent.
DEIF A/S
Flowcharts
Designer's Reference Handbook