Setting Up The Controller System (Plc/Master) - Festo CPX-FB33 Manual

Cpx bus node
Hide thumbs Also See for CPX-FB33:
Table of Contents

Advertisement

2. Commissioning

2.5.4 Setting up the controller system (PLC/Master)

Festo P.BE-CPX-PNIO-EN en 1407c English
1. Click once on the station symbol (on the left next to the
station name) and afterwards double click on the hard-
ware symbol in the "Object name" column.
The hardware configuration window HW Config (station
configuration) opens.
2. Open the Hardware Catalogue (Catalogue View, 1 in the
adjacent figure).
1
3. Select your control system (PLC/Master) in the Hardware
Catalogue (e.g. "SIMATIC 300", 1 in Fig. 2/1):
Click on the Plus symbol to expand the selection.
4. Open the rack folder (e.g. RACK-300, 2 in Fig. 2/1).
5. Double click on the rack rail symbol (e.g. RAIL, 2
in Fig. 2/1).
A sub-window (with rack rail symbol in the header) opens
in the left area of the HW Config window ( 3 or 4 in
Fig. 2/1).
The sub-window symbolises the rack rail (profile rail) of
your control system. You compile the individual elements
of your controller in this child window and thus form the
basis for your PROFINET automation system.
2-25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpx-fb35Cpx-m-fb33Cpx-m-fb34Cpx-m-fb35Cpx-fb34

Table of Contents