Setting Up The Controller System (Plc/Master) - Festo CPX Series Manual

Bus node, network protocol profinet io
Hide thumbs Also See for CPX Series:
Table of Contents

Advertisement

2. Commissioning

2.5.4 Setting up the controller system (PLC/Master)

Festo P.BE−CPX−PN IO−EN en 1008b
1. Click once on the station symbol (on the left next to the
station name) and afterwards double click on the
hardware symbol in the Object name" column.
The hardware configuration window HW Config
(station configuration) is displayed.
2. Open the Hardware Catalogue (Catalogue View, 1 in the
adjacent screenshot).
1
3. Select your controller system (PLC/Master) in the
Hardware Catalogue (e.g. SIMATIC 300, 1 in Fig. 2/5):
Click on the plus symbol in order to expand the selection.
4. Open the rack directory (e.g. RACK−300, 2 in Fig. 2/5).
5. Double click on the rack rail symbol (e.g. RAIL, 2 in
Fig. 2/5).
A child window (with rack rail symbol in the header)
opens in the left−hand area of the HW Config window
( 3 or 4 in Fig. 2/5).
The child window symbolises the rack rail (profile rail) of
your controller system. You compile the individual
elements of your controller in this child window and thus
form the basis for your PROFINET automation system.
2−25

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpx-fb33Cpx-m-fb35Cpx-m-fb34

Table of Contents