2. Commissioning
1
1
Deactivate checks, if applicable, so that correctly filled-in ONLINE fields are not
overwritten.
Fig. 2/18: Selection of the I&M identification data for transfer to the bus node
2-62
Load identification properties into the bus node
1. In the "PLC" menu, click on "Download Module Identifica-
tion..." (Target System > Download Module Identification).
The window "Download Module Identification" is dis-
played.
2. Enter the new identification properties in the fields under
"Offline" (examples: see Fig. 2/18).
3. Make sure that, a check is entered in the check boxes under
"Include" only if you want to load new I&M data into the bus
node.
Note
Remove the check under "Include" if correct data are
already in the "ONLINE" field; otherwise, these data will be
overwritten!
4. Confirm the inputs with OK.
Festo P.BE-CPX-PNIO-EN en 1407c English