Instructions For Commissioning With Siemens Simatic Step 7 - Festo CPX-FB33 Manual

Cpx bus node
Hide thumbs Also See for CPX-FB33:
Table of Contents

Advertisement

2. Commissioning
2.4

Instructions for commissioning with Siemens SIMATIC STEP 7

Festo P.BE-CPX-PNIO-EN en 1407c English
Commissioning of a CPX terminal requires an exact proced-
ure, since, possibly for each station, i.e. for each I/O device in
the PROFINET network, different configuration specifications
are required due to the modular structure.
The following sections describe the basic configuration steps
with the SIEMENS PLC SIMATIC S7 and the Siemens SIMATIC
STEP 7 configuration and programming software.
Knowledge of how to operate the STEP 7 software is assumed
in the following.
Other control systems may require other settings or a differ-
ent approach.
Note
Please observe the configuration instructions in the manu-
al of your control system (PLC/IPC).
The illustrations and specifications in this description refer to
the following variants:
GSDML/PNIO Specification V. 2.25
Controller (PLC/CPU) Siemens SIMATIC S7-317
with FW V. 3.2.x7-317
Control software Siemens STEP 7 V. 5.5 with Service
Pack SP 3.
Please take information on other variants from the documents
on your controller and control software.
In case of technical problems, please first contact the respect-
ive manufacturer. In cases of doubt, your local Festo Service
is happy to help you further.
2-19

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpx-fb35Cpx-m-fb33Cpx-m-fb34Cpx-m-fb35Cpx-fb34

Table of Contents